Construction Quote Template

A construction quote is a fixed price for a scope you have defined, held until a stated date, with the exclusions printed on it. The template below is that document, live: materials and labor in separate sections, markup and tax carried as fields, an exclusions block already written, and a numbered PDF headed QUOTE at the end of it. It is the same sheet as the estimate — of the 27 fields in this document only 6 change the number, and the heading is not one of them. What changes when you write QUOTE on it is what you are committed to.

A worked construction quote is loaded below — replace every line with your scope. Free, no signup.

Your business
Business name
Phone
Email
Address
Website
Client
Client name
Company (optional)
Phone
Email
Address
Document details
Document type
Quote #
Date
Valid until
Line items
Materials
$7,400.00
$3,250.00
$2,980.00
$4,100.00
$2,600.00
Labor
$8,680.00
$11,200.00
$3,400.00
$1,150.00
Tax, markup & discount
Tax rate %
Markup %
Discount (%)
Notes, terms & signature
Notes (visible to client)
Terms
Saved estimates (Pro)

Your work autosaves to this browser. Pro adds named saves so you can keep every client's estimate on hand.

Blank templates:WordExcelPDFGoogle Docs — coming soon
Your Business Name
QUOTE
Quote #QUO-100
DateSep 13, 2026
Valid untilOct 13, 2026
DESCRIPTION
QTY
RATE
AMOUNT
MATERIALS
Framing and structural package, delivered
1
$7,400.00
$7,400.00
Concrete and reinforcement, placed
1
$3,250.00
$3,250.00
Roofing, flashing, and weatherproofing
1
$2,980.00
$2,980.00
Windows and exterior doors, as scheduled
1
$4,100.00
$4,100.00
Interior finishes allowance (fixed sum)
1
$2,600.00
$2,600.00
Materials subtotal
$20,330.00
LABOR
Carpentry crew, framing through dry-in (per hour)
140
$62.00
$8,680.00
Subcontracted mechanical, electrical, plumbing (quoted firm)
1
$11,200.00
$11,200.00
Site supervision and coordination
1
$3,400.00
$3,400.00
Waste container, haul-off, and final clean
1
$1,150.00
$1,150.00
Labor subtotal
$24,430.00
Subtotal$44,760.00
Markup (12%)$5,371.20
TOTAL$50,131.20
NOTES

FIXED PRICE for the scope listed above, based on the drawings and specifications dated as referenced. EXCLUDES: design and engineering, permit and impact fees, rock or unsuitable-soil excavation, hazardous-material abatement, utility company connection charges, landscaping, window coverings, and appliances. Allowances are stated as fixed sums; a selection above an allowance is priced by change order before it is ordered. Quantities and rates in this demo are editable placeholders so the arithmetic has something to work on — they are not price guidance.

TERMS

This quote is a firm offer for the scope and price shown, held until the validity date above. Written acceptance forms the agreement. Work outside the listed scope, and any allowance exceeded by the owner's selection, is priced by change order before it is performed.

Accepted by (signature)
Date
Created with estimate-generator.comPage 1 of 1
Total
$50,131.20

Same arithmetic, different promise

Contractors ask whether a quote template is a different document from an estimate template. On this site it is measurably not: the builder above runs one document model, and only 6 of its 27 fields have any effect on the total — tax rate, markup, discount type, discount, qty, rate. The remaining 21 describe, label, date and bound the work. The word at the head of the page sits in that second group.

That is not a reason to treat the two as interchangeable — it is the reason to be careful. Nothing in the software stops you turning an estimate into a quote, because nothing in the arithmetic can tell the difference. The difference is entirely in what the client may hold you to, and it is carried by one word plus the exclusions and the validity date around it. If you are unsure which of the two you are about to send, estimate vs quote sets out which one binds you.

The four things that make a construction quote survivable

A scope tied to documents. Reference the drawings and specifications by date or revision. “As per plans” with no revision named means you have quoted whichever version the client chooses to remember.

Exclusions on the face of it. Permits, engineering, rock excavation, abatement, utility charges, landscaping. Every one of those has sunk a residential quote that was otherwise priced correctly, and each one is a single line of text now versus an argument later.

Allowances stated as fixed sums. Carry the number, then say in writing that a selection above it is priced by change order before it is ordered. Allowances are where a fixed-price job quietly becomes a cost-plus job with no upside.

An expiry date. It defaults to 30 days out here. It is what lets you re-price without embarrassment when a supplier moves: the client did not lose a discount, the quote simply lapsed.

Quoting a client, bidding an invitation, pricing a change

These are three documents and contractors routinely send the wrong one. A quote goes to a client who came to you: firm price, your exclusions, your validity window. A construction bid goes into a competitive process against someone else’s bid form, held open for a stated period and judged line against line. And once the job is awarded, every scope change gets a change order signed before the crew touches it — never a re-issued quote, which erases the record of what was agreed the first time.

If you would rather start from the estimate structure and decide later, the construction estimate template loads the same job as an estimate, and the browser-based estimating tool loads it in takeoff units. For non-construction work, the general free quote template is the shorter service-work version of this page.

Construction quote template FAQ

Is this construction quote template free?

Yes. Fill it in and download the PDF with no account, no trial and no card. Free PDFs carry one small credit line at the foot; the optional Pro upgrade removes it. Nothing else is held back.

Should I send a construction quote or a construction estimate?

Quote what you can see and control — a defined scope on drawings you have read, with materials you have priced. Estimate anything that depends on what is behind the finish or under the slab. A quote is a firm offer you can be held to; an estimate is an informed forecast. On a renovation, quoting a scope you have not opened up is how contractors end up building the difference for free.

What should a construction quote exclude?

Write the exclusions on the face of the document, not in the covering email. The usual list: design and engineering, permit and impact fees, rock or unsuitable-soil excavation, hazardous-material abatement, utility connection charges, landscaping, and anything an inspector adds beyond the documents quoted. The preloaded sheet above carries that block in the notes field so it prints on the PDF.

How do allowances work on a quote?

An allowance is a fixed sum carried for a selection the client has not made yet — tile, fixtures, finishes. State it as a fixed sum on its own line, and say in the notes that a selection above the allowance is priced by change order before it is ordered. Without that sentence an allowance is just an underpriced line you agreed to.

How long should a construction quote stay valid?

Put an expiry on it and keep it short when material prices are moving. This template fills the validity date in 30 days ahead by default and prints it at the top. A quote with no expiry is a price you have agreed to honour indefinitely, through whatever your suppliers do next.

Can I split materials and labor on the quote?

Yes, and on construction work you should. Suppliers and crews move independently, so when one side shifts you can point at the lines that moved instead of reopening the whole number. The sheet above loads with both sections filled in.